High Cross Quarter - Leicester
Client : Hammersons
Main Contractor : Sir Robert McAlpine
Contract length : 18 Months
 
A major extension and refurbishment of The Shires Centre in Leicester comprising a new two-level retail mall designed by international firm, Chapman Taylor Architects.
 
COMPCO were involved from design through to completion. New pumped water supplies were installed to maintain sprinkler protection while part of the original Centre was demolished. 185 tonnes of fire-fighting water are stored at roof level above the Centre, an engineering feat in its own right. New sprinkler systems were installed throughout the extended centre to protect not only Landlord areas but to provide connections to each unit.
 
 
East London Waste Authority - Frog Island
Client : Mouchel / Shanks Waste Solutions
Main Contractor : Mouchel
Contract length : 6 Months
 
We initially fitted a sprinkler system at roof level to protect the building while the recycling and processing equipment was installed. Subsequently, COMPCO fitted sprinkler protection to the labyrinth of plant and conveyors. Three water storage tanks were installed and a pump house with diesel and electric motors constructed. Testing and commissioning were completed on time and the sprinkler protection was fully operational prior to the site receiving its first delivery of waste.
 
 
Thales - Crawley
Client : Crown House
Main Contractor : Crown House Technologies
Contract length : 11 Months
 
Part of the Project Sapphire works with Crown House Technologies, building D houses production and test areas for aircraft simulators. The project involved pumped water supplies, one 950 cubic metre tank and 2 diesel pumps, feeding 7 separate installations protecting roof, office areas and low level production facilities to FM standards.
 
 